Single Phase Underground Service Entrance (200 Amp or Less) Single Phase Underground Service (400 Amp) 200 Amp Meter Pole Installation 100 Amp Meter Pole Installation 60 Amp Temporary Pole Installation Conduit Installation for 3 Phase Open Delta 120/40 Volt Transformer 3 Phase Transformer Pad Installation C.T. 4. Sales and delivery are limited to locations inside Sumter EMC's service territory in Georgia. 9. rigid galvanized or IMC, with weatherhead. construction power poles.Be sure to tamp the pole solidly in the ground. WHAT GIVES ALABAMA POWER COMPANY THE RIGHT: Easements, also called rights of way, gives Alabama Power Company the right to use another landowner's property in order to construct and maintain transmission facilities such as towers, poles, lines, guys, anchors, and all communication lines necessary or convenient in connection therewith. However, in the event these rules conflict with the General Rules of the Alabama Public Service Commission, the latter shall govern. ADDITIONAL BRACING WILL BE REQUIRED SERVICE HEADS shall be located high enough to provide the required vertical clearance of Sam Houston Electric If the receptacles are exposed to weather, then you'll need in-use covers. Each service must have a 15 or 20 amp GFI protected outlet installed and must have either a 30 amp 240 volt or a 50 amp 240 volt receptacle installed (see "J" on Figure 1). Social security number. 3. Renewable Energy Credit (REC) Program Standard Air Conditioning verses Air Source Heat Pumps Geothermal or Ground Source Heat Pumps. The Alabama Cooperative Extension System, the primary outreach organization for the land-grant mission of Alabama A&M University and Auburn University, delivers research-based educational programs that enable people to improve their quality of life and economic well-being. setting out requirements on starters and voltage available. Four local high school juniors will represent Clarke-Washington EMC this year at Montgomery Your Tour on March 15-17. Read More: Property Owner Rights & Electric Power Easements. Some utilities companies will also set-up the temporary pole for an additional fee. NESC 236 CLIMBING SPACE Climbing Space is an unobstructed, vertical space along the side or corner of the pole. In gen-eral, it consists of an imaginary box, 30-inches square, extending at least 40 inches above the highest communications cable or other facility and 40 inches below the lowest communications Main Circuit Breaker: CSR2200. $5 Membership fee. Developer Requirements Underground-Commercial (pdf) Developers Procedures (pdf) Line Extension Easement Agreement (pdf) . 810-6-1-.03. 1.27 "Pole" means a utility pole that is owned by NES that supports power lines or streetlights. Foley - (251) 943-5001 Daphne - (251) 626-5000. Sprout Contact Us. Air Pollution Control Program. Uses your W-9 form to set up your new account. Before Reporting an Outage Down Power Lines Security Lights. Appalachian Power uses Flurry Analytics Service (provided by Yahoo) in order to improve its mobile apps. 2003 IRC E3501.6.2. MINIMUM REQUIREMENTS : METER POLE INSTALLATION 39 Elm Street, P.O. Headquarters 19600 State Highway 59 Summerdale, AL 36580 8:00 A.M. to 4:30 P.M. M-F Get Directions Delivery Address: 19646 State Highway 59 Summerdale, AL 36580 The pole must be located to where the service drop to the pole will . Residential & Commercial. Ala. Code 40-21-64 (2002): Counties prohibited from levying privilege/license tax. Currently in stock at over 200 retail stores, we've been building meter loops and meter poles for more than 20 years, with thousands now in use throughout Texas, Louisiana and Arkansas. Today, the . Power Delivery Engineer ALABAMA DEPARTMENT OF REVENUE - SALES AND USE TAX RULES Code of Alabama 1975, Secti ons 40-23-31 and 40-23-83. This Division prescribes the rules of procedure for hearing appeals of administrative actions of the Alabama Department of Environmental Management; petitions for rulemaking; and, rules of procedure for meetings of the Alabama Environmental Management Commission. Our crews have the experience, resources, and equipment to provide you with the temporary power system you need. Service Entrance Cable Sizes Aluminum---#4/0 Copper--#2/0 200 AMP Meter Socket 200 AMP Main Breaker Panel 2" Pipe Nipple 2" Conduit #4 Solid Bare Copper Ground Wire 5/8"x8' Galvanized or Copper Ground Rod 200 AMP Meter Pole Requirements for Central Al. Apply Online. Poles may be wood, steel, aluminum, or concrete. Type Pole Dimensions Round 5" Top Diameter Square 6" x 6" 2. (E) The generating capacity of the utility's plant, supplemented by the electric power regularly available from other sources, must be sufficiently large to meet all normal demands for service and provide a reasonable reserve for emergencies. Dadeville Pole will make a $5 million investment in the property with plans to construct a facility to produce power poles, pilings and related products for utility suppliers and other entities. No joints above or within 2 feet of top of pole. Size of conductors from meter base to panel will . We offer superior dealer support including: Profitable Power-Pole Sales and Installation; Easy 24/7 factory direct ordering; No stocking minimum The neutral wire is below the transformer and acts as a line back to the substation and balances out the amount of electricity or load on the system. Adding 30% to the cost now may seem large, but if the time comes when you can't do with 100 amps, replacing your new 100 amp service with a 200 amp service increases the price by approximately 30%.We have added a . 2022 Youth Tour Delegates Announced. But, before I . 6. Some utility companies will bring it from the street to your ready made pole. 8. Intro Rates Vegetation Management Construction Specification. Billing/Deposits CAEC offers our new Member's choices on how you would like to be billed: comes with your unit. website, or by calling our member service department at (800) 837-3374 or (251) 989-6247. of housing more than two single pole circuits shall have a main breaker. Greeneville Light and Power System 423-636-6200 www.glps.net Revised June 7, 2002. procedures and policies and supplement the General Rules of the Alabama Public Service Commission. The standard height of power lines depends entirely upon the city and state they're in and the types of power lines on the pole. Requirements & General Service Added code reference to attachment point . Offices Open: 8:00 AM to 5:00 PM, Monday - Friday. Ph: (256) 880-6054. meter number (if applicable) 2. Cutouts act like a fuse and open when there is a problem with the line or a section of it. Flurry's privacy policy governs the use of this information. FindLaw Codes are provided courtesy of Thomson . Assists with your disconnect service request. Address: 41103 U.S. Hwy 72 Stevenson, AL 35772; Business hours: Monday - Friday, 7:30 a.m. - 4:30 p.m; Phone: Electric: 256-437-2281 or 800-572-2900 We'll be using a 30 AMP 120. Requirements for Electrical Service The information and recommendations in our Meter and Service Guide are, in general, sufficient to answer questions concerning a majority of electrical installations. ComEd SYSTEM STANDARD ACAD is to be used only in conjunction with electric service provided by ComEd. The pole should be mounted no further than 70 feet from where the house will be built. Electric Service. entire plat map with the above requirements redefined. Deposit (amount depends on credit history) Our company stocks generators, temporary power poles, electrical boxes and much more to surpass your requirements. Pole length shall be minimum 17' or 21' depending on weatherhead height requirement. Assists you with getting information on the status of your service request. Basically, you build the pole to the utilities specifications, and follow NEC while you do it. Jan 26, 2022. The op is installing a 400 amp service using 2- 200 amp panels. Tamp dirt must be used around the pole base after every 6" of fill to secure the pole. Call Us Main Office/Member Services 256-737-3200 or 800-242-1806 To Report a Power Outage 256-737-3201 or 800-242-1806. SERVICE POLE. 1. A crossarm holds the wires up on the pole. 2.Only one service per dwelling, except for multiple occupancy buildings. Phone number (mobile number preferred for texting outage information) Completed and signed membership application. I have the meterbase, breaker box and outlets already wired up and ready to go. NEC 230.2. Metering Installations for Mobile Homes or Mobile Home Parks: Overhead Installations The metering pole must be a minimum of 17 ft, Class 5 pole set at least 4 ft deep so that it will be of sufficient height and stability to provide service drop clearances as shown on page 31. #19: 12172020 025055 Page 4 of 17 Vertical Clearance for Service Poles 9. There's no "Temporary power pole requirements" section in the NEC. Two ft of conduit above pole. Entrance cable to Mobile Home 8' Min. Pole 40" Min. Match the service requirements. In 2018, Alabama Extension reached 1 in 3 Alabama . Maintain pole plumb, replace if rotted. Our service department needs to know the full extent of the outage. Meter Can and Cabinet Demopolis, AL 36732 Phone: 1-334-289-0845 Toll Free: 1-800-242-2580 Hours of Operation: Monday - Friday 7:30 a.m. - 4:30 p.m. Headquarters 19600 State Highway 59 Summerdale, AL 36580 8:00 A.M. to 4:30 P.M. M-F Get Directions Delivery Address: 19646 State Highway 59 Summerdale, AL 36580 For conductor height over trolleys, railroad tracks, telephone lines, etc., consult . In order to set a meter, an 18-foot treated pole must be placed with 4 feet in the ground. It is also suitable for service entrance equipment. Despite recommended minimum ground clearance levels starting at 12 feet, industry standards now lean toward 35 feet or higher. I also can't find any specific wording disallowing it either. Electrical Disconnects. Call 256-737-3201 to report a power outage, or one of our other outage reporting options. The standard height of power lines depends entirely upon the city and state they're in and the types of power lines on the pole. Attachment) exceeds the loading requirements set forth in the Applicable Standards. Conductors to service poles must have a minimum ground clearance as follows: A. He will report to Nicholas K. Akins, AEP chairman, president and chief executive officer. ox 471, Delhi, NY 13753 Telephone: (607) 746-2341 Fax: (607) 746 . But this is the minimum service size allowed by the National Electrical Code, and you leave little room for future expansion. (i.e., 200 A service requires a 200 A meter pan) . Mobile County Inspection Services has begun Electronic Plan Review (EPR) for . Usually closer is better. North Alabama Gas District. CONDUIT STRAPS MINIMUM OF 3 FOR RIGID METAL . Power-Pole is the original shallow water anchor. Please refer to the specifications on page 11. Underground Electric Service Requirements 100 AMP Capacity, 120/240-Volt Single-Phase . Sewer mains and lift stations. From its modest beginning in 1916, Riviera Utilities has grown immensely. Camper/Temporary Pole Requirements for Power Connection Any pole being used to mount the meter base and disconnect to must be 18 feet in height, at least 5 inches in diameter OR pressure treated 6-inch X 6-inch minimum. Vertical raceways on construction temporary service (CTS) poles shall be minimum 3/4 inch in trade size supported at intervals not to exceed 3 feet, and shall be service-entrance cables or service-entrance conductor shall be installed in the following . To Obtain Service. Service address (911 address) Mailing address, if different from service address. The ooperative will supply, install and own the service drop to the pole and the service wire attachments on the pole. The utility plan must detail the following information: Water mains. Requirements for Customer-Owned Poles Rev. THIS STANDARD SHALL BE USED TO SPECIFY GENERAL REQUIREMENTS FOR SECONDARY SERVICE CONNECTIONS. Eaton's versatile Mobile Home Panels have a user-friendly design that allows for a faster, cleaner installation. 4.1.4. Apply at our office located at 3196 County Hwy 55, Hamilton, AL 35570. Please see the following documents for information on customer-owned: Meter & Service Guide Current Transformer Enclosures - Manufacturers & Specs OH-4 CATV Ariel Service Pole. Read this complete Alabama Code Title 37. Pole shall be braced Install on side of pole opposite service drop. Gas mains. I have contacted the local power company to come out to land we have purchased and install a temporary, construction style hook up to a temporary power pole. $20 Connection fee. Alabama Ala. Code 11-50B-3 (2002): ROW usage fees must be assessed on a competitively neutral and nondiscriminatory basis. Natural Gas. OH-5 Aerial Commercial (Up to 600 Amps) . This is your opportunity to become a dealer for one of the most popular and respected brands in the industry. comes with your unit. Headquarters 19600 State Highway 59 Summerdale, AL 36580 8:00 A.M. to 4:30 P.M. M-F Get Directions Delivery Address: 19646 State Highway 59 Summerdale, AL 36580 Connect Service Disconnect Service. You may call Cherokee Electric Cooperative's service department at 800-952-2667 or 256-927-5524. utility pole. NEC 230.79. The drawings shall include a utility plan detailing the location, size, and type of all utilities being constructed to service the subdivision. What I need to know is things like height requirments if any, depth of pole in ground, etc. Here at Everest Electrical, we are proud to offer both steel and timber power pole installations. American Electric Power today announced that Raja Sundararajan, currently senior vice president - Regulatory and Customer Solutions, will become the company's executive vice president - External Affairs when Charles Patton retires July 1. MLPP is your source! The Fee Schedule for permits and applications for various permits can be found on our DOWNLOADS page. This request for service is not an application for service to the completed building. 1.035 Timely request for service location shall be made by the PHPEHUat the nearest Cooperative District Office before construction is started. May 23, 2022. read more. To be parallel they must begin and terminate together. Business Service Center Assists with your request to set up a temporary and/or permanent service account. All poles to be inspected for defects prior to erection. Pole shall be minimum 6" round or 6"x6" treated wood. The location should be located away from traffic areas to avoid damage. ALWAYS CONTACT YOUR UTILITY PROVIDER to make sure you meet their requirements . Public Utilities and Public Transportation 37-15-2 on Westlaw. Government Issued Photo ID. 800-405-6822 Temporary Power Items in Birmingham, AL If you select to rent from our temporary power box business in Birmingham, AL, being satisfied is an understatement. Capable of delivering a range of power from 120 volts to 33,000 volts, our estimators and power engineers . Electric Cooperative Pole Must be 20' Long, Treated, & 6"x6" Sq. utility pole. FACTORY INSTALLED POWER SUPPLY CORD WILL BE ALLOWED. The temporary power pole, wiring, and equipment are to be supplied by the member or installed by your contractor, builder, or electrician. Physical address of home in which you need power. methods which are mutually applicable to power supply and communication systems. Become an Authorized Power-Pole Dealer. 3.Service disconnecting means shall be located at the point of entrance of the service conductors. Please be prepared to provide the account number, name and phone number associated with your account. Fax completed contract to 256-535-1344, or email it to com_ind@hsvutil.org, or bring it to our office at 112 Spragins Street, SW. For each UTPL there is a $200.00 deposit, a one-time set-up fee of $70.00, a one-time connection/installation fee of $115.00, and a monthly pole rental of $30.00. Read More: Property Owner Rights & Electric Power Easements. City of Madison Public Works. You will need to call your utility company and ask about the procedures for applying for temporary power. 1.036 The Cooperative will provide service to public or private airports in accordance with paragraph 1.031 above. Ala. Code 11-50B-10 (2002): Public providers may exercise all powers of eminent domain as they are conferred on Alabama municipalities. Installation. Lightning arrestors protect the pole and equipment Ph: (256) 772-8490. C Notice: The information contained on this page is the sole property of ComEd and PAGE 1 OF 3 C7800 REVISES STANDARD DATED 12-11-15 3-29-19 What are the meter-loop pole requirements for a new service? 1.26 "Operator" means the company or organization that will be applying for attachment to NES infrastructure. If you have any questions, it is recommended that you contact the Inspection Services office at (251) 574-3507 or permits@mobilecounty.net prior to beginning any work. The neutral wire is below the transformer and acts as a line back to the substation and balances out the amount of electricity or load on the system. Grain Bin Restrictions Height Requirements for Overhead Line Call 811 Before You Dig. The service entrance cable shall be sealed at the meter socket entrance with bushing and sealant. In just the past 10 years, Power Plus has installed over 250,000 power poles and hung over 21 million feet of electrical wire. The rest of your list should be covered by the utilities specification, and/or requirements of the builder. It must have at least 2 outlets. Residential Recycling Service. Conduit Option: 2 inch I.D. West Florida Electric has provided the following guidelines for several types of electrical service installations for the convenience of its members.This information is strictly intended for use as a guide. Large Debris / Yard Refuse Collection. The pole must be set a minimum of 4 feet into the ground. Installing additional circuits for an RV or Travel Trailer Camper and a Submersible Well Pump to a Temporary Power Pole Service. To apply at our office, you must bring: A photo identification. Division 3. Quotes and receives your service account deposit. By the way I don't believe 2- 200 amp panels are considered a parallel install. 5. These Rules shall be construed together with the General Rules of the Alabama Public Service Commission. 3. Actual construction of electrical service installations must comply with the latest version of the National Electric Code, the National Electric Safety Code and any Federal, State, County . These wired meter poles are complete with meter socket, mast, and 200-amp main breaker (or fuses . Meter Pole Requirements for Central Al. NESC and GLPS requirements. Your meter number would also help us identify your location. T. 310.15 (B) (6) is not allowed-- that is a 400 amp service. Electric Service. 1.A minimum of 100 Amp 3-wire service for a single-family dwelling unit. Return this form and completed application to Baldwin EMC By fax: (251) 989-0133 By mail: Baldwin EMC PO Box 220 Summerdale, AL 36580 Or deliver to one of our offices: Summerdale (Headquarters) 19600 State Highway 59 Summerdale, Alabama North Baldwin Give us a call today locally at (334) 365-6762, or toll free at (800) 545-5735, and one of our customer service representatives will assist you with finding the solution that is right for you. Pole-mounted service entrance cable straps shall be installed at the weatherhead, 12 inches from the weatherhead, 12 inches from the meter socket, and at 30 inch intervals. The metal frame of all motors must be grounded to the system common neutral in the entrance switch. When any of these holidays occur on a Saturday, it will be observed on the preceding Friday and when any of these holidays occur on a Sunday, it will be observed on the following Monday. All meter sockets shall be mounted in a manner that allows meters to be inserted and withdrawn Solid Waste Disposal Authority of Huntsville. Each service must have a 15 or 20 amp GFI protected outlet installed and must have either a 30 amp 240 volt or a 50 amp 240 volt receptacle installed (see "J" on Figure 1). Contact Us. Cutouts act like a fuse and open when there is a problem with the line or a section of it. Dadeville Pole, a subsidiary of Alabama-based Ziebach & Webb Timber Co ., signed an agreement to acquire 23 acres in the Thweatt Industrial Park. What is a Mini-Split Heat Pump System. Installation of a private power pole must always be performed by a qualified electrician who is licensed to perform this work. Guying of the meter pole may also be required for additional support; taller poles may be required to obtain proper code clearances. Juniors from each high school in the Clarke-Washington EMC area were asked to submit an essay and the top two students from each school were invited. TEMPORARY SERVICE Temporary service is very helpful at construction sites. Ground Rod & Clamp #4 Bare Copper Ground Wire Main Breaker Panel 2" Galvanized Pipe Nipple Meter Socket Furnished by CAEC Waterproof Connector more than 12" from the pole to the home ground level approved ground rod clamp 5 1/2' from ground to center of meter mobile home poles and must be within 24" of eyebolt minimum of 12' heighth to weatherhead 200 amp: use 2/0 thw hotlegs, with minimum 18" tails for connection tvec will spot all mobile home poles #1 neutral stranded copper (effective date - December 13, 2021 . This service shall be installed at a location mutually agreed upon by the member and the Cooperative. Air Bag Materials Used By Tire Manufacturers. Wired meter poles and meter pedestals are available for purchase from Sumter EMC for installations requiring a meter pole or meter pedestal. Meter Poles. We will provide temporary service to properly wired meter poles. All service entrance equipment shall be supplied and installed on the pole by the member. Usually it's 60 amp. Electric Cooperative Pole Must be 20' Long, Treated, & Minimum 6" Round Diameter Pole Materials Required 100 AMP 4' 18" Min. The MHM200P is 200 amp unit and is designed with ample width to ensure plenty of room for wire bending and an easier installation. WHAT GIVES ALABAMA POWER COMPANY THE RIGHT: Easements, also called rights of way, gives Alabama Power Company the right to use another landowner's property in order to construct and maintain transmission facilities such as towers, poles, lines, guys, anchors, and all communication lines necessary or convenient in connection therewith. If you hire someone, it usually costs about $450-$750 which may or may not include the permit that the electrician will get.